Installation of delivered machines
The system installation includes assembly, start-up and metrology testing.During the installation, the presence of the end-user personnel is not required unless otherwise agreed. However, local support for supply connections, internal transportation, lifting and unpacking is to be provided by the end-user. The metrology test will be performed according to the International CMM performance standard ISO 10360-2.